Playscape: Health and Safety Portal

Welcome to the health and safety portal for Playscape

This is the portal page for the Playscape location and structure of the project at NMW. Here, you will be able to access the project health and safety documentation for the New World event at the National Memorial Arboretum, including:

  • Specific health and safety arrangements for the activity inc. risk assessments,

  • Specific build health and safety permit to work,

  • The construction phase plan.

Please scroll down to access the relevant areas.

  • RAMS and SOPS

    The risk assessments and SOPS are provided in the CPP but you can also use this link to access directly without going via that document.

    Click the button below to access and download the RAMS and SOPS directly.

  • Project Plans and Structural Design

    Use this link to access the plans and structural designs (where applicable) for this element.

  • Construction Phase Plan

    A key part of the safety arrangements and controls that have been implemented are during the construction phase. As the Principal Contractor, WR have provided this CPP for all staff contractors and other parties that may interact with the work activity.

  • Online Health and Safety Induction

    All staff, crew, and freelancers working onsite during the construction and derig phases must complete the site safety induction. This induction has been completed on behalf of the Principal Contractor for the build and area under the control of Wild Rumpus.

    Please click the link below and complete the induction BEFORE you access site.

  • Build Permit to Work

    All structures being built for Wild Rumpus will have an overall permit to work in place. This will be for the duration of the build and will include working at height, lone working, breaking ground, and any other specific works.

    Upon submission of the permit, a copy will be issued to the production manager which will be shared with NMA.

    Click the link below to begin your permit.

Online Retainer Tools

  • Online Production / Technical Risk Assessment

    This online risk assessment tool will help production and technical arrangements when dynamic assessments need to be made. Outlining hazard and control measures will allow new risks and controls to be recorded.

  • Online risk assessment tool

    Online Site Risk Assessment.

    Our online risk assessment tool is available to our retainer clients to use when they are on site. This online tool helps identify significant hazards for general activity. Adding your control measures will allow you to download and share a copy of your risk assessment.

  • Online Completion Certificate

    Once the structure has been installed, use our online completion certification tool to share with the end client or agency. This confirms the trailer has been has been installed safely and is being handed over in a completed and safe state.

  • Online Accident Reporting

    As an event operating over a number of days and long hours, it is important that accident and near miss incidents are reported as soon as possible.

    This also ensures staff working for OJ can report online securely, without the need to store or keep handwritten forms.

  • HS Advice and Contact

    To contact your advisor or one of the team for a specific health and safety question, please click here to access contact details., or use the chat function on this page.